Overview

In 2019, the City authorized the completion of a City Wide Drainage Modeling Study that evaluated and modeled existing conditions of the City's drainage system. The results indicated that the majority of the City has limited drainage capacity, with some areas having less than 2-year capacity. These findings indicated a need to improve the city's streets and drainage system. 

Scope of Work

The East Side improvements are broken down into two packages: 

  • Package One (1) included paving and drainage upgrades along University Boulevard from Buffalo Speedway to Kirby Drive. - Completed
  • Package Two (2) includes paving and drainage upgrades along Wakeforest Avenue from Plumb Street to Pemberton Street, Rice from Wakeforest to Kirby Dr., and Duke Street from Buffalo Speedway to Wakeforest. - In Progress

To receive updates on this project, residents are encouraged to sign up for East Side Drainage Improvement notifications. Version OptionsEast Side Drainage Improvement ProjectHeadline

East Side Project Location Map

Project Timeline

2024

  • May 13 - Package 2 Construction Initiation
  • April - Estimated Package 1 Substantial Completion 
  • March - Estimated Council Approval for Package 2 Contractor 
  • February - Package 2 Bid Process initiation (24-month duration) 
  • January - Estimated Package 2 Design completion

2023

  • April - Project Construction Initiation of Package 1 (13-month duration)
  • March 29 - Public Townhall Meeting #2

2022

2021

  • December 12 - Design Contract awarded to HDR Engineering
  • November 15 - City Council accepted final PER.
  • October 20 - PER Completed 
  • September 20 - City Council Workshop to discuss additional PER updates. 
  • June 28 - City Council Workshop to discuss PER 
  • May 17 - Draft PER Review 
  • February 2 - Kick-off meeting held with City Staff and HDR.
  • January 22 - Official Notice to Proceed Issued to HDR Engineering, Inc., to complete the Preliminary Engineering Report. 

Contact Us

  1. Eduardo Barreto

    Capital Projects Manager
    713-662-5848
    Contact Eduardo Barreto

    Public Works Administration

    3826 Amherst
    West University Place, TX  77005

    Public Works Customer Service

    Phone: 713-662-5839

    After-Hours Emergency
    Phone: 713-668-0330

    Staff Directory

  1. East Side Drainage Improvement Project - Package Two

    Posted on September 19, 2025

    On Monday, Sept. 22, crews will begin replacing sections of roadway panels between the 3000 - 2800 blocks of Duke Street, weather permitting. This work will not require a complete closure of Duke Street; however, traffic control measures will be in place. Read on...
View All News
  1. West University Place Texas Homepage

Contact Us

  1. Public Works

  2. 3826 Amherst Street

  3. West University Place, TX 77005

  4. Phone: 713-662-5839

  5. Non-Emergency/After Hours: 713-668-0330

Government Websites by CivicPlus®
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow